8.1 By the [5th] working day after each cycle, the patch coordinator sends the executive sponsor a report showing, for each pairing of asset importance (high, moderate, low) and vulnerability class (1 to 5): the share of assets patched by their deadline, the mean days to patch and the median days to patch.
8.2 The report lists open exceptions with their age, assets without an owner, and windows missed with the cause.
8.3 The board receives the high-importance column for classes 1 and 2 each [quarter]. Group owners receive their own group's cells.
8.4 Data for each figure is exportable from [system] and kept for [period].